To
watch the sunrise on New Year’s day, the upper level of Gwangandaegyo Bridge
will be open to all visitors from 6 a.m. – 8:30 a.m. on January 1, 2017.
Traffic on the upper level of the bridge will be shut down from 5 a.m. - 10
a.m. on January 1, 2017, while the lower level of the bridge will be open to
vehicles.
The
sunrise event on the bridge may be canceled in case of heavy rain or snow.
Pets, bikes and motorcycles are not allowed at the sunrise event.