1960 ~ 1970 First and second phase of waterworks expansion

HOME > Public Information Section > Historical Graph > 1960 ~ 1970 First and second phase of waterworks expansion

[1960 ~ 1970 First and second phase of waterworks expansion]

1961~1966 First phase of the waterworks expansion
1961~1966 First phase of the waterworks expansion
  • Summary : Expansion of Myungjang water purification (38 thousand ㎥ daily)
  • Industrial facilities :
    • Expansion of waterworks by further developing Hwedong Reservoir
    • Construction in Ohryundong Treatment Plant capable of producing 15 thousand ㎥ daily
    • Expansion of Hwedong Reservoir Dam by 5.5 meters
  • Total production Capacity: 133 thousand ㎥ daily
1961~ 1966 First Phase of expansion of waterworks Expansion of Hwedong Dam
1961~ 1966 First Phase of expansion of waterworks Expansion of Hwedong Dam
Expansion of Hwedong Dam
1966~1971 Second phase of expansion of water works
1966~1971 Second phase of expansion of water works
  • Summary : The 5 year plan to revolutionize Korea’s industrials caused water shortages leading Nakdong River to be utilized as the main reservoir source.
  • Industrial facilities :
    • Yangsang water pump activating from Hwedong Reservoir in Yangsang to Myungjang, Ohryun Treatment Plant
    • Expansion of Myungjang Treatment Plant to supply 110 thousand㎥daily by the way of pipe (Mulgeum ~ Hwedong) 1,100 M/M 10.3KM and Dosu Drainage 3KM installation
    • Cooperation with Germany’s Lamaiusa
  • Total production Capacity : Total Production Capacity : 263 ㎥ daily (Supply rate 74%) Producing an average an individual daily 192ℓ
1966~1971 Second phase of expansion of waterworks
1966~1971 Second phase of expansion of waterworks
Utilizing Nakdong River through the Suro tunnel the water flows to the Hwedong Reservoiry
1966~1971 Second phase of expansion of waterworks
1966~1971 Second phase of expansion of waterworks
Construction at Nakdong River